There were reports in News that MWSSB does not have design details of disposal system planned for treating Sheri Nalla wastewaster at Rasulwadi and pollution problems cannot be resolved due to unavailability of design.
Walchand College of Enginnering had done the design of this plant during the time, I was in service at the college. I am giving below the details of prefeasibility report of the STP design, we had submitted to MWSSB.
Now, Dnyandeep Infotech has started Environmental Consultancy division and we wish to provide all technical help required to SMK Corporation in solving all outstanding environmental problems.
We have with us experts who have designed Sheri Nalla scheme under National River Action Plan, We have EPRF and Nature Foundation who are providing technical solutions to many projects treatment of Industrial wastes, Nature conservation projects like Agrani River. We also have tieup with excellent NABET approved Environmental Engineering laboratory.
Dr. N. S. Raman, an international authority on EIA and retd. Dy. Director of NEERI, Nagpur is our new director and we shall make Sangli again as the center of excellence in Environmental Protection technology.
No comments:
Post a Comment